Restoration of “Castello Lambertini” – Ferrara

Realizzati | Restoration and Renovation

Restoration, repair and structural improvement after the earthquake 2012 of “Castello Lambertini” in Poggio Renatico (FE).


Amount: € 4.181.719.


Temporary joint venture with IMartini (systems) and Lithos (surface restoration)